• Full Title:
    Amendment of Part 15 regarding new requirements and measurement guidelines for Access Broadband over Power Line Systems/Carrier Current Systems, including Broadband over Power Line Systems
  • Document Type:
    Report and Order
  • Bureau(s):
    Engineering & Technology
  • Description
    Affirmed the rules for Access Broadband over Power Line (Access BPL) systems. Made minor modifications to improve and clarify the rules. by Second Report & Order
  • DA/FCC #:
    FCC-11-160
  • Docket No:
    04-37
    03-104
  • FCC Record Citation:
    26 FCC Rcd 15712 (19)
  • Federal Register Citation:

Files

Primary Attachment
Report and Order: doc pdf txt

Document Dates

  • Released On:
  • Effective Date:
  • Adopted Date:
  • Issued On:
  • Tags: