• Full Title:
    Amendment of Part 15 of the Commission's Rules to allow Certification of Equipment in the 24.05-24.25 GHz band at field strengths up to 2500 mV/m
  • Document Type:
    Order
  • Bureau(s):
    Engineering & Technology
  • Description
    Extended the time for filing oppositions to the Petition for Reconsideration this proceeding to June 28, 2002
  • DA/FCC #:
    DA-02-1162
  • Docket No:
    98-156
  • FCC Record Citation:
    17 FCC Rcd 8825 (13)

Files

Primary Attachment
Order: doc pdf txt

Document Dates