• Full Title:
    Amendment of Part 2 of the Commission's Rules to Realign the 76-81- GHz band and the Frequency Range Above 95 GHz Consistent with International Allocation Changes
  • Document Type:
    Erratum
  • Bureau(s):
    Engineering & Technology
  • Description
    Issued Erratum correcting minor errors in Report and Order, FCC 04-20, released February 12, 2004
  • Docket No:
    99-261
    03-102

Files

Primary Attachment
Erratum: doc pdf txt

Document Dates