• Full Title:
    Connect America Fund High-Cost Universal Service Support
  • Document Type:
    Report and Order
  • Bureau(s):
    Wireline Competition
  • Description
    Adopted platform, addressing the design of the network and network engineering, for Connect America Cost Model to estimate forward-looking costs of Connect America Phase II deployment
  • DA/FCC #:
    DA-13-807
  • Docket No:
    05-337
    10-90
  • FCC Record Citation:
    28 FCC Rcd 5301 (7)

Files

Primary Attachment
Report and Order: docx pdf txt

Document Dates

  • Released On:
  • Effective Date:
  • Adopted Date:
  • Issued On:
  • Tags: