• Full Title:
    Improving Public Safety Communications in the 800 MHz Band (WT Docket No. 02-550
  • Document Type:
    Order
  • Bureau(s):
    Engineering & Technology
  • Description
    Waived the deadline by which Sprint Nextel Corporation is required to complete the transition of the broadcast auxiliary service (BAS) to frequencies above 2025 MHz for 45 days
  • DA/FCC #:
    FCC-09-13
  • Docket No:
    95-18
    00-258
    02-55
    02-550
  • FCC Record Citation:
    24 FCC Rcd 3340 (4)

Files

Primary Attachment
Order: doc pdf txt

Document Dates