-
Full Title:Request for Clarification of RAO 21 With Respect to Installation of Emergency Standalone Routers in Remote Terminals
-
Document Type:Letter
-
Bureau(s):Wireline Competition
-
DescriptionClarified that the installation of emergency standalone routing capability at a terminal classified as a remote concentrator prior to installation of such capability shall not alter the classification of that terminal or location as a remote terminal
-
DA/FCC #:DA-09-553
-
Docket No:08-235
-
FCC Record Citation:24 FCC Rcd 2945 (4)
Files
Document Dates
-
Released On:
-
Issued On: